Click here to read complete article
APA Group has completed the installation of a gas pipeline, 905 m of which runs under the Brisbane River.
APA contracted Diona Civil Engineering Contractors, with additional support from Coe Drilling, for the pipeline installation, completed at a depth of 10 m below the river, as part of the Murarrie Looping Project.
The horizontal directional drill (HDD) and pipe pull involved a 500 t drill rig, two franna cranes and six excavators, completed over 24 hours using 70 workers…read more