Hawle collaborates on its NoDig technology

Click here to read complete article

A world first was achieved when Hawle demonstrated that service connections for water supply can be established from a basement without a pit or trench on the water main in the street, eliminating all the unwanted implications of street excavations.

This difference from existing semi-trenchless techniques requires vast additional technological efforts including:

  • accurate determination of the main line’s position
  • precise steerable drilling of a blind hole
  • durable connection, without manual aid, of a 1 to 2 inch (26 to 51 mm) service pipe to a main of 150 mm diameter or more
  • a portable, light-weight component design that provides enough power to handle the sits conditions.

Despite many sophisticated pipe locating, precision drilling…Read More

Share on facebook
Facebook
Share on twitter
Twitter
Share on linkedin
LinkedIn

Leave a Comment

Your email address will not be published.